·
Electricity Act 1989
·
NCSC CAF 4.0
·
NIS Regulations 2018
·
RIIO-ED2
What it produces
One branded proposal document. Four components.
Every engagement produces a single board-ready document with four sections, structured for director-level attestation and direct use in regulatory engagement.
Ofgem penalty exposure model
Exposure bands calibrated against matched Ofgem enforcement precedents with multipliers for consumer detriment, cooperation posture, and contravention duration.
Operational downtime cost estimate
Cost modelling grounded in the Ofgem RIIO-ED2 Value of Lost Load framework applied to declared outage parameters.
CAF 4.0 gap analysis and roadmap
Maturity scoring across the NCSC CAF 4.0 contributing outcomes with a prioritised remediation roadmap sequenced by regulatory materiality.
AI regulatory narrative
Commentary grounded in cited regulatory sources. Every sentence tagged Verified, Inferred, or Assumed so confidence is visible on the page.
Fit
Who this is for. Who it is not.
Licensed UK energy network operators: distribution, transmission, generation, supply.
Operators under active Ofgem investigation or enforcement correspondence.
Compliance functions preparing a documented CAF 4.0 baseline before formal assessment.
Boards wanting a costed, prioritised remediation roadmap ahead of a price control cycle.
A formal CAF 4.0 assessment submissible to Ofgem.
Independent legal advice on licence condition compliance.
Technical validation of cyber security control effectiveness.
Platform
PULVINIR Energy is one vertical within the PULVINIR platform.
Contact
Under investigation? Let’s talk this week.
Tell us about the situation. We’ll reply within 48 hours with a call invite. Conversation is confidential under mutual NDA if you want it to be.
